pl

Fixed Pro Installing Manual

Check all goods according to the packing list

• Check the label on cabinet. Know details about led screen,

such as input voltage range, the power consumption(

Notice:Our factory voltage is 220V. If local voltage is

110V input, check the power supply whether support or

not. If yes, change the power supply input voltage to 110V)

• Example:Muen-O-F-P10

Cable connection Cabinets :5×3

Single cabinet cable connection

Cabinet Fixing

Requirements for installing sending card

One PC:

• PC Hardware:CPU: ≥i3, DDR3: 2G, Graphic card Memory:

1G, with DVI output or independent Graphic card with PCI

card slot

Connection for sending card and PC

Clone Mode

Shortcut keys: WIN+P (Notice:only use for Windows system above Windows 7)

Software installation-LED Studio

Upload CON File

** This step is only need to do when the CON file is broken or isn’t uploaded on led screen because we have uploaded when we do the aging test on factory

1. Open LED SET

Open screen config Click Screen Configuration and choose

display connection

2. Upload directly if you have CON file; otherwise need to do connectingLines according to receving card connection and screen width and height.Sending to receiving card and then Save which must be done afterconfirming all is ok. Or you will lose all setting after turning off the powersource and screen (See expample: 5*3)

Change Display Window